The gallery area designated by the building was established together with transparent groups and maximum utilization of daylight has been ensured.The 3-group dynamic structure was offered to the user by synthesizing natural materials and light. The glass bricks available in the stairwell have been delocalized with a wooden frame. Surface mounted wall washer has preferred at the junction points of the roof eaves. The wooden columns envisioned for the terrace of the front façade give the modern structure a baroque finish.
The gallery area designated by the building was established together with transparent groups and maximum utilization of daylight has been ensured.The 3-group dynamic structure was offered to the user by synthesizing natural materials and light. The glass bricks available in the stairwell have been delocalized with a wooden frame. Surface mounted wall washer has preferred at the junction points of the roof eaves. The wooden columns envisioned for the terrace of the front façade give the modern structure a baroque finish.